Old 03-23-2010, 02:57 PM
  #1614  
buddy'smom
Super Member
 
buddy'smom's Avatar
 
Join Date: Jul 2009
Location: NY
Posts: 5,337
Default

Originally Posted by MadQuilter
Originally Posted by LovingIzabella
No pressure at all on anyone but we have just about 3 weeks left on this swap-how is everyone doing?
I have a bit of a dilemma:

When I first started sewing (after my work project from hell was over). I decided to do 2 blocks for each F8. One is the same for everyone and one different - depending what the fabric wanted.

Now I have 20 squishies in the post and 1 more ready to go, leaving 14.

I know that I can get the single blocks done in time, but not 2. Should I finish the single block, send it out to meet my deadline and send the second block out later?

Any input?
Well all I can say ladies, her blocks are well worth the wait, mine were just stunning.
buddy'smom is offline