Originally Posted by MadQuilter
Originally Posted by LovingIzabella
No pressure at all on anyone but we have just about 3 weeks left on this swap-how is everyone doing?
I have a bit of a dilemma:
When I first started sewing (after my work project from hell was over). I decided to do 2 blocks for each F8. One is the same for everyone and one different - depending what the fabric wanted.
Now I have 20 squishies in the post and 1 more ready to go, leaving 14.
I know that I can get the single blocks done in time, but not 2. Should I finish the single block, send it out to meet my deadline and send the second block out later?
Any input?
No problem waiting for blocks...so no pressure from here.
Hugs, Gigi12