Old 05-07-2008, 08:38 AM
  #6  
c2cd2008
Senior Member
 
Join Date: Apr 2008
Posts: 323
Default

Well I have to roll it each time. My rails use this tubing like IV tubing I just dont take it all the way out of the grooves. But yes each time I load I just roll it along with the new.

As far as loading the frame. Here is what I did because I get confused as well. I typed up my instructions and took pictures along the way. I printed them out, laminated them and punched a hole in them and put them on a keyring that I hung on the end of the frame. So I have a picture pictorial to use as refrence and it stays fresh because its in laminate. IF you dont have a thermal laminator you can get the send sealing kind at wally or any office supply.
c2cd2008 is offline