Prioritize... I work a FT and a PT (20 hrs a week) job. I seem to find the time if I really want to get something done. I love Post-It notes to remind me where I left off and what I need to do next. Also keep each project together in a plastic shoe box or zipped project bag and separate baggies inside. Sometimes I'm at a point in a project I can take things with me to work on during my lunch breaks too.