"Rhapsody" Progress
#1
Power Poster
Thread Starter
Join Date: Jul 2008
Location: East Oklahoma - pining for Massachusetts
Posts: 10,477
While in the process of repairing my blue quilt Rhapsody, I took it over to the bed and laid it upside down. I made a little check to see how much is quilted, and it looks to be about 2/3 done.
(about the repairs...had to take out 3 blocks that some feline ruined. The new batting is in, and the three blocks are sewn. Just have to add them on and patch the backing fabric.)
Hey, I may even make the deadline. (But I don't know which one.) ;)
(about the repairs...had to take out 3 blocks that some feline ruined. The new batting is in, and the three blocks are sewn. Just have to add them on and patch the backing fabric.)
Hey, I may even make the deadline. (But I don't know which one.) ;)
#4
Power Poster
Thread Starter
Join Date: Jul 2008
Location: East Oklahoma - pining for Massachusetts
Posts: 10,477
Originally Posted by sharon b
Hey you don't have to pick the deadline until its done :wink: LOL :thumbup:
Thread
Thread Starter
Forum
Replies
Last Post