Nine Patch Project

Subscribe
40  48  49  50  51  52  60 
Page 50 of 68
Go to
Thank you Amy. :-D
ann clare the top looks great! :thumbup:

Ok now you have made me feel guilty. :oops: Time to fire up the machine!
Reply
Quote: Swan Song-Happy Belated Birthday!!!
Yes, Happy Belated Birthday!! And same here, need to fire up the machine, too! ONLY 29 Blocks behind!!
Reply
Here's how to use 5 9P's. This was a my doll swap quilt for June

about 22 inches square
[ATTACH=CONFIG]76614[/ATTACH]

And the label
[ATTACH=CONFIG]76615[/ATTACH]

attachment-76609.jpe   attachment-76610.jpe  

Reply
Beautiful work! :thumbup:
Reply
My goodness, I'm behind. I have made 30 blocks so far. The first 20 9 patches were made from 5" squares and went into a baby quilt. The next are from 4" squares and I'm doing a D 4 to 9 patch block and I'm loving the results. I haven't touched my machine in over a week.

Tomorrow's another day, getting together with Lynnejean for a sew day! This board is WONDERFUL! :thumbup:
Reply
Um...how many blocks are we up to? I think I may have fallen behind.
:oops:
Also, if I want to share with y'all what I've managed thus far, is it better to post here, or on the pictures threads? I've seen people do it both ways and am not sure which would be best!
Reply
I *think* we should be at about 30 blocks, June 15 - July 15. Is this right?
Reply
Gee i have been making 9 patches right along and just realized i never signed up LOL. they are fun to do and i am making mostly 4 1/2 finished, but i did make some bigger to do the d9p with. 4 of the d9p will be my july doll quilt. Love all the quilts you are doing i just got caught up reading the thread this am.
Reply
thequilterslink I will add you to the group. :D
I believe we are at 31 blocks. I am 6 behind and will be 7 tomorrow because I have to work tonight. :-(

I will be catching up this weekend. I have the fabric for my DM washed and pressed. I think I will start on that next since I just found out she will be having hip replacement the beginning of Nov. I want to be sure to have a lap quilt out to her before that. Once I have all the 9P done for that I can go back to the Christmas topper presents. I need to sit in the corner and chant or something, things around here have been crazy! :roll:

Everyone's projects are looking GREAT! :thumbup:
Reply
Actually, I just checked and thequilterslink I have you signed up.
Reply
40  48  49  50  51  52  60 
Page 50 of 68
Go to
Manage Preferences Your Privacy Choices