Go Back  Quiltingboard Forums >
  • Main
  • Question: How Long >
  • Question: How Long

  • Question: How Long

    Thread Tools
     
    Old 02-22-2012, 08:38 AM
      #1  
    Super Member
    Thread Starter
     
    Join Date: Sep 2011
    Location: East Tennessee
    Posts: 1,102
    Question Question: How Long

    Just a general question: How long does it typically take you to make a quilt top? Not a "race-to-finish" top, but a standard full-to-queen sized with a fair amount of piecing?

    I'm curious because I'm going to have to "trade services" to get a quilt top I need made. It's a specific applique pattern every other block and a fan on the other blocks. I'm wondering how long it would take from beginning to end! Then I started pondering and thought it would be fun to get everyone's "times"!
    AshleyR is offline  
    Old 02-22-2012, 08:49 AM
      #2  
    Power Poster
     
    Join Date: Mar 2011
    Location: Ontario, Canada
    Posts: 41,535
    Default

    What kind of applique? If it's needle turn, that would take me a month to 6 months depending on how complex the design was to do those blocks. If it's machine applique, about a week for the applique blocks and maybe a 2 weeks for the pieced blocks. I seldom work on the same project from start to finish so it's hard to say. Quilting is my fun time so I don't rush.
    Tartan is offline  
    Old 02-22-2012, 08:53 AM
      #3  
    Super Member
     
    Join Date: Apr 2010
    Location: Illinois
    Posts: 9,312
    Default

    As each quilt pattern is a bit different it can be tough to get a true measurement. I have done full bed size log cabins , 1.5 inch cut logs in 8 days but that included 1 1/2- 2 days of sorting scraps , ironing, starching, and cutting from very irregular scraps. That does not include quilting. Needless to say I must have been in the mood.
    I do find that even for some of the more complicated patterns .. if I do not have it done in 6 -7 weeks , there is a good chance it will never be done. My threshold for working with the same textiles/pattern for more than several weeks can be a bit low, plus the motivation to move on to the next is pretty high.
    Lori S is offline  
    Old 02-22-2012, 08:55 AM
      #4  
    Senior Member
     
    roseirish48's Avatar
     
    Join Date: Feb 2012
    Posts: 878
    Default

    I did a Trip around the World In two weeks from start to finish...other quilts any where from two-4 months depending on pattern and complexity
    roseirish48 is offline  
    Old 02-22-2012, 09:35 AM
      #5  
    Power Poster
     
    Join Date: Jan 2011
    Location: Upland CA
    Posts: 18,376
    Default

    Depends on pattern, and of course how much time I have to work on it,LOL
    mighty is offline  
    Old 02-22-2012, 09:37 AM
      #6  
    Super Member
     
    Pam S's Avatar
     
    Join Date: Apr 2008
    Location: Northern KY
    Posts: 1,939
    Default

    Always a lot longer than I think it will!
    Pam S is offline  
    Old 02-22-2012, 10:15 AM
      #7  
    Super Member
     
    grammy Dwynn's Avatar
     
    Join Date: May 2007
    Location: Oregon
    Posts: 2,042
    Default

    That is a loaded questions! Depends upon tooo many things. Of course the pattern is number one, then the size and the number of pieces that have to be cut. Then each sew-er sews differently ~ some are speed demons and others are creepy crawlers. Then of course one should factor in un-sewing. ;(

    A friend says that Eleanor Burns lied about 'a quilt in a day', because it took her a whole lot longer.
    grammy Dwynn is offline  
    Old 02-22-2012, 10:16 AM
      #8  
    Super Member
     
    Buckeye Rose's Avatar
     
    Join Date: Jan 2011
    Location: Monroe, IN
    Posts: 2,283
    Default

    I did a queen size bargello in just over 2 weeks
    Buckeye Rose is offline  
    Old 02-22-2012, 10:34 AM
      #9  
    Senior Member
     
    Join Date: Nov 2008
    Location: Minnesota
    Posts: 862
    Default

    I make a lot of different full sized quilts, although none have been applique. Based on the audiobooks I play while quilting stuff, would say it takes 40-50 hours for me to piece a top from cutting to finishing the borders. I do not have a design board, which honestly does slow you down. I do a lot of shortcut techniques, but some things just have no fast way of being done.

    Eleanor Burns lied about 'a quilt in a day',
    Actually, not true. I have done a full sized Log cabin in about 8 hours, from cutting to finishing the top. You can actually have it stuffed and on the bed in another 2 hours. I was a lot younger then. These days, I can only sew for about 3-4 hours in a day.

    Last edited by IAmCatOwned; 02-22-2012 at 10:36 AM.
    IAmCatOwned is offline  
    Old 02-22-2012, 11:06 AM
      #10  
    Super Member
     
    mom-6's Avatar
     
    Join Date: Feb 2010
    Location: Texas
    Posts: 6,395
    Default

    Since I do my quilting in odd moments between doing everything else in my life, a completed quilt can take anywhere from a day or two to months or years.
    mom-6 is offline  
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    Patti Mahoney
    General Chit-Chat (non-quilting talk)
    13
    07-11-2011 05:58 PM
    LucyInTheSky
    Main
    8
    11-27-2010 03:38 PM
    MissM
    General Chit-Chat (non-quilting talk)
    19
    07-14-2010 11:21 AM

    Posting Rules
    You may not post new threads
    You may not post replies
    You may not post attachments
    You may not edit your posts

    BB code is On
    Smilies are On
    [IMG] code is On
    HTML code is On
    Trackbacks are Off
    Pingbacks are Off
    Refbacks are Off



    FREE Quilting Newsletter