Go Back  Quiltingboard Forums > Main
The Big UFO Challenge >

The Big UFO Challenge

The Big UFO Challenge

Thread Tools
 
Old 01-04-2009, 06:20 PM
  #21  
Member
 
gigi2landon's Avatar
 
Join Date: Nov 2008
Posts: 93
Default

RATS, I thought I'd created a new acronymn! hehe

oh well, I'm sending all these tops to the long arm quilter anyway. SO Technically I'm finished with them. Hum.......

I Don't like UFO's
gigi2landon is offline  
Old 01-05-2009, 04:52 AM
  #22  
Power Poster
 
Join Date: Sep 2007
Posts: 18,726
Default

Originally Posted by gigi2landon
RATS, I thought I'd created a new acronymn! hehe

oh well, I'm sending all these tops to the long arm quilter anyway. SO Technically I'm finished with them. Hum.......

I Don't like UFO's
:lol: :lol:
sandpat is offline  
Old 01-05-2009, 12:37 PM
  #23  
Super Member
 
Lucky Patsy's's Avatar
 
Join Date: Sep 2007
Location: Northern California
Posts: 1,240
Default

Boston 1954, PIGS are Projects In Grocery Sacks! Purchased and planned but not yet started! My sewing room is very porky!
Lucky Patsy's is offline  
Old 01-05-2009, 01:10 PM
  #24  
Super Member
 
Barbm's Avatar
 
Join Date: Apr 2007
Location: blink and you've missed it
Posts: 2,562
Default

I finished my ugly quilt and my niece's quilt. I have 1 more- don't care for it, so I'm ignoring it.

I won't start anything without finishing it. no more wips/ufos for me!

Barbm
Barbm is offline  
Old 01-06-2009, 12:28 AM
  #25  
Super Member
 
kd124's Avatar
 
Join Date: Mar 2007
Location: Camas, Washington
Posts: 2,593
Default

I got mine done, but have been waiting for my sis to take a digital pic so I can get it posted. Thanks for the challenge because who knows when I would have finished it. It was started to take to meetings to work on and it never worked out that I could work on it. I got sidetracked by Christmas but hustled after Christmas to finish it.
kd124 is offline  
Old 01-09-2009, 03:33 AM
  #26  
Super Member
 
GailG's Avatar
 
Join Date: May 2008
Location: Louisiana
Posts: 6,764
Default

Originally Posted by bj
I'm finishing mine right now. It was a BOM at the LQS and I just got the last block. I have the top all put together, but I haven't got it sandwiched and quilted. I think I'm going to order a fatback instead of piecing the back. Or I may just get some muslin for the back. I hate piecing the backs! And it will give me a really nice piece of fabric to use from something else. :) :) Win, win...right?
:oops: OK, so what's a "fatback"?
GailG is offline  
Old 01-09-2009, 03:41 AM
  #27  
Super Member
 
GailG's Avatar
 
Join Date: May 2008
Location: Louisiana
Posts: 6,764
Default

Originally Posted by Barbm
I finished my ugly quilt and my niece's quilt. I have 1 more- don't care for it, so I'm ignoring it.

I won't start anything without finishing it. no more wips/ufos for me!

Barbm
OK, Barb, can we hold you to that? :lol:
GailG is offline  
Old 01-09-2009, 03:52 AM
  #28  
Super Member
 
PamH's Avatar
 
Join Date: Sep 2007
Location: Missouri
Posts: 1,458
Default

Yep I got all 6 of the granddaughters quilts made for Christmas!!
PamH is offline  
Old 01-09-2009, 04:16 AM
  #29  
Super Member
 
Join Date: Nov 2006
Location: Missouri
Posts: 1,822
Default

I was a late starter on the UFO projects:))I started in November:0)I have 3 done!! And, just a few left. I am going to keep going until even my projects that I have stashed fabrics for are done:))So, at the end of this year I will be so saaaad about the lack of projects, I will have to do it again:))That buying and stacking thing:))I still have 3 BOM's that I need to catch up...detailed ones:))I did finish 2 of my other ones. If I had that amazing quilting machine w/frame here, I just know I could keep caught up:))LOL Don't you think?!! I'm just sure of it!:))Skeat.........who had to turn my head and hold it that direction w/my hand when asked by my LQS if I wanted to do the black and white and 30's BOM!! I soooo could...:))but, didn't!Pulled myself out of that store scratching and scream'n out the door;)
Skeat is offline  
Old 01-09-2009, 08:00 AM
  #30  
Super Member
 
Barbm's Avatar
 
Join Date: Apr 2007
Location: blink and you've missed it
Posts: 2,562
Default

funny Gail :) I will do my best to stick to that goal!

I made a list of projects for the year. I have 11 "Must do", 2 "if I have to", 5 wips- stuff I cut out but didn't like so I set aside, this includes the 2 I am working on right now- can that be classified as UFO?, hmmmm. Then I have the list of 5- "whenever, they haven't asked lately" projects I have the fabric for but haven't started.

It's supposed to snow tomorrow- 3 to 6 inches. I figure I can finish the 2 I'm working on and sandwich and quilt 2 wips. That will make a lot of stuff crossed off the list. Cool.

My goal is to FINISH this list by March. A lot of them I know I can do easily, but need to find the time. (Gosh- I certainly hope people stop having babies, too- that messes up the project list- j/k)

Barbm is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
asimplelife
QuiltingBoard Challenges & Contests
491
12-06-2014 06:06 AM
Gennynut
Main
77
03-18-2012 08:52 AM
DannyValentine
Main
17
08-09-2011 06:08 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



FREE Quilting Newsletter