Go Back  Quiltingboard Forums > Main
Virtual Quilting Weekend--2/16-2/19/18 >

Virtual Quilting Weekend--2/16-2/19/18

Virtual Quilting Weekend--2/16-2/19/18

Thread Tools
 
Old 02-15-2018, 08:31 PM
  #11  
Super Member
 
Join Date: Oct 2011
Location: South Central Indiana
Posts: 1,931
Default

I'm in a finishing mood, here's one I finished tonight. It will be auctioned at our guild show in October.
[ATTACH=CONFIG]589166[/ATTACH]

For some reason, I could upload the pic of the quilted and bound one, but at least this one would load.
Next up, to sandwich and start the quilting on my Talking Turkey...
Attached Thumbnails Click image for larger version

Name:	20180120_144417.jpg
Views:	796
Size:	1.28 MB
ID:	589166  
QuiltingVagabond is offline  
Old 02-15-2018, 09:08 PM
  #12  
Super Member
 
Join Date: Jan 2015
Posts: 2,867
Default

Machine #1, FMQ a very large throw that isn't going well so it's been in timeout. Machine #2, first seams on a Labyrinth quilt for my son and his new wife. It's been a while since I followed a pattern so I'm a little apprehensive, which is ridiculous. I don't think it's a difficult pattern as long as I use the design wall.
Irishrose2 is offline  
Old 02-15-2018, 09:42 PM
  #13  
Super Member
 
frustratedquilter40's Avatar
 
Join Date: Jan 2012
Location: Pacific Northwest
Posts: 1,311
Default

Yes I needed this..... I need to get a quilt top together for Monday to hand off to be quilted by my friend who has longer. Just cut the fabric Monday have 3 blocks done 17 more to go
frustratedquilter40 is offline  
Old 02-15-2018, 09:42 PM
  #14  
Member
 
Join Date: Sep 2011
Location: Lake Stevens, WA
Posts: 34
Default

I'm in. I have the diagonal piecing of the blocks for the center of BH's Easy Street to get together and then need to piece the borders and attach them to have a completed flimsy. I'll be extremely lucky if I get that done.
maryjane is offline  
Old 02-15-2018, 10:40 PM
  #15  
Super Member
 
Join Date: Jan 2013
Location: Florida
Posts: 3,825
Default

I'm in. All day today was quilt related. First was a small group quilt time. I finished piecing the top and back of a quilt for charity and then gave them to a member who LOVES the quilting process....

Next was a quilt show committee meeting
Quick lunch while drove 1 hr to Fresno for another meeting with Awesome Artists (AA), we're seriously addicted. We'd made a group quilt and the first showing was at the guilds quilt show (the judges comments were excellent and got 1st place).

Then some shopping, no fabric but did get some needed summer cloths.
Got home in time to watch the Olympics & Bachelor Winter Games.

Just heard DH get home. So I'm off.

Last edited by petthefabric; 02-15-2018 at 10:55 PM.
petthefabric is offline  
Old 02-15-2018, 10:45 PM
  #16  
Super Member
 
Join Date: Oct 2015
Location: Va.
Posts: 5,752
Default

I’m in. Today worked on decorating a bathrobe for an art installation. Tomorrow will stretch an art quilt over stretcher bars so it can be delivered to gallery on Sat. Then Ikm going to get to work on a UFO so I can have a Feb. finish for that challenge!

Rob
rryder is offline  
Old 02-16-2018, 03:55 AM
  #17  
Super Member
 
Join Date: Mar 2011
Location: Maryland
Posts: 2,579
Default

Count me in! Plans: hand-stitch binding to back on Christmas panel quilt (sorry, not done for this year's church bazaar, will be ready extra early for next year) finish quilting the border and attach binding to cow quilt (you've seen the panels with the bovines) hopefully quilt and attach binding to angel quilt. If I can get the last one quilted, I'll be more than proud of myself. I actually cleaned, changed needles, test sewed yesterday so the machine is ready and waiting!
QuiltMom2 is offline  
Old 02-16-2018, 04:39 AM
  #18  
Senior Member
 
donac's Avatar
 
Join Date: Aug 2010
Location: Jersey Shore
Posts: 536
Default

I am in. Need to get sashing done for my Christmas scrap quilt.

I have a costume meeting tonight and maybe tomorrow morning but dh is working tomorrow afternoon so I should get some sewing done. I have to finish this top so I can get back to hand quilting
donac is offline  
Old 02-16-2018, 05:52 AM
  #19  
Super Member
 
Join Date: Mar 2010
Location: Central Indiana
Posts: 1,112
Default

I'll be working on Train Ride 18!! Need to catch-up to the rest of the gals,
ka9sdn is offline  
Old 02-16-2018, 06:21 AM
  #20  
Super Member
 
tucsonquilter's Avatar
 
Join Date: Jul 2010
Location: Tucson, AZ
Posts: 1,081
Default

Yep, I'm in. I have 6 blocks from the BOM I joined that I need to make to catch up. So I am thinking after each block I will post the finish and hopefully that will keep me on track this weekend......lol
tucsonquilter is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Raggiemom
Main
104
12-06-2016 05:45 PM
Raggiemom
Main
3
09-30-2016 08:01 PM
Raggiemom
Main
176
02-21-2014 11:39 AM
Raggiemom
Main
47
09-30-2013 07:26 AM
Raggiemom
Main
10
06-10-2013 07:23 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



FREE Quilting Newsletter