Old 09-10-2010, 05:14 AM
  #183  
quiltinghere
Super Member
 
quiltinghere's Avatar
 
Join Date: Mar 2010
Location: PROFESSIONAL Longarm Quilter NW Indiana
Posts: 3,398
Default

Originally Posted by labbyrobinson
I am out of town and had planned on being home by yesterday, but am now stuck in occupational therapy (broke my left wrist) until 9/29. Washed and ironed fabric and have purchased cutting mat and 24"ruler from Walmart (since my good stuff is all at home). Luckily I have travel quilt kit with me which has rotary cutters, tape, etc. The point being, I will most likely not have mine mailed until the 13th. Already have the priority envelope addressed and stamped with return label and postage enclosed. Don't count me out, I will just be your "last minute gal". And that drives me crazy, cuz I usually want to get things done RIGHT NOW! LOL
As long as it's *postmarked by the 13th* (not the 14th or later) - you're good! Thanks for checking in.

Only THREE business days left to mail!
quiltinghere is offline