I have one room that holds my quilting, my office and my cake decorating. I had my DGD come in and help me two weekends in a row and we did all of the fabric. We had a donate pile, a UFO pile and put back in by color pile. We also put on the top shelf that were hard to reach the special project fabrics ( chenile, velvet, silks for crazy quilts, etc since these were so large and heavy and the silks really don't like hand prints) and on we went on little cubby at a time. DGD loves to fold and put in the cubbys so we teamed it and took little snack breaks.. we had a yummy time with a shared movie at the end of each day. When the fabric was done I am afraid the rest was mine. Oh boy. So I started on the UFOs, only two left. They will be there awhile since it is now over 90 degrees and they are queen size. So I went on the the folded Christmas balls for a charity Christmas event. DGD and I knocked off about 40 and used up scads of Xmas fabrics -oh boy. What do I pick next? The crazy quilt. Here it is June, and I am on square 11. The only good thing is that you only work on a 12 x 12 inch square at a time so it is not hot, but this will take awhile so the quilt, office, cake, room straightening is put off once again. So you really are not alone.