Old 03-06-2013, 01:28 PM
  #248  
justflyingin
Super Member
 
Join Date: Nov 2010
Location: Jozefow, Poland
Posts: 4,474
Default

I probably have 50+ tops sitting around waiting to be finished. It is why this year I'm trying to finish 1 top per week. We'll see if I can actually do that. Someone sent me some smaller tops that need to be finished, but otherwise, all those 50+ tops are bed sized.

I got started off this year behind because I was so sick in January that I didn't feel like sewing. Normally I get a lot done right after Christmas. However, I've finished several in the last couple of weeks--need to finish up a few more in order to get close to 10 where my goal is since we are around week 10 for the year.
justflyingin is offline