How many Quilts do you have lined up to work on?
#242
First off...we are not counting the ones I am planning or all the patterns I have downloaded! So, let me see....I have just finished one, got it in the mail today! Started sewing another one last night. Have a top almost finished and need to get it done and in the mail for son by June 1. Got BOM started for this board (1st ones I have ever done)-need to do March block. Got all fabric for 2 others with patterns to use. Got fabric on the way for 1 other (gonna use Army/101st Airborne patches on the top for DH). AND....my daughter is taking me to Hobby Lobby Saturday with $100.00 to spend as my birthday present. She even ask me if that was enough...God bless the child!
#245
Too many and yet, not enough!
Completed tops: 3
Tops in Progress: 2
Needs binding: 1
Sandwiched but needs quilting finished: 1
Quilts in the planning stages (fabric purchasing underway or complete): 3
Quilts in the planning stages, no fabric purchased but are on my schedule: 6
Quilts I want to make: thousands
I use shoe boxes to keep them all straight. Got the boxes for free from a local shoe store - just walked in and asked!
Completed tops: 3
Tops in Progress: 2
Needs binding: 1
Sandwiched but needs quilting finished: 1
Quilts in the planning stages (fabric purchasing underway or complete): 3
Quilts in the planning stages, no fabric purchased but are on my schedule: 6
Quilts I want to make: thousands
I use shoe boxes to keep them all straight. Got the boxes for free from a local shoe store - just walked in and asked!
Last edited by kaelynangelfoot; 03-05-2013 at 04:24 PM.
#248
Super Member
Join Date: Nov 2010
Location: Jozefow, Poland
Posts: 4,474
I probably have 50+ tops sitting around waiting to be finished. It is why this year I'm trying to finish 1 top per week. We'll see if I can actually do that. Someone sent me some smaller tops that need to be finished, but otherwise, all those 50+ tops are bed sized.
I got started off this year behind because I was so sick in January that I didn't feel like sewing. Normally I get a lot done right after Christmas. However, I've finished several in the last couple of weeks--need to finish up a few more in order to get close to 10 where my goal is since we are around week 10 for the year.
I got started off this year behind because I was so sick in January that I didn't feel like sewing. Normally I get a lot done right after Christmas. However, I've finished several in the last couple of weeks--need to finish up a few more in order to get close to 10 where my goal is since we are around week 10 for the year.
Thread
Thread Starter
Forum
Replies
Last Post
AngelinaMaria
Main
21
10-16-2012 04:25 PM
craftybear
Main
25
09-18-2011 03:23 PM