View Single Post
Old 12-17-2013, 07:50 AM
  #18  
romanojg
Super Member
 
Join Date: Dec 2010
Location: Norfolk, VA
Posts: 5,397
Default

Totally understand. I decided to make the grown up kids all quillows, NFL ones, that's 15 of them. I'm so far behind its unreal. Last night as I was doing some of the stitching, I thought to my self. I'll go ahead and do them all and topstitch them with a single stitch and then if I don't have time to do the pockets, at least they'll all have throws. They are all NFL nuts, not me. Then I'm making the little ones blankets with a small pocket and a teddy bear to put in it, that's done on my emb machine. This doesn't include the baking, cleaning, etc that needs to be done. Then, I also have to go and get my daughters birthday gift which is 3 days after Christmas. There are lots more projects that I want to finish before Christmas but not sure its happening.
romanojg is offline