View Single Post
Old 01-02-2016, 09:06 AM
  #10  
Krisb
Super Member
 
Krisb's Avatar
 
Join Date: Aug 2011
Location: Asheville, previously Lake Vermilion, Tarpon Springs, Duluth, St Paul, Soudan
Posts: 1,651
Default

Judy Niemeyer Amazon Star (already cut, and let me tell you--the discipline needed for cutting, labeling, bagging all of the fabrics was already a challenge for me), a grey/black/white water color quilt, another FLW quilt and this time I will keep the black strips at the correct width. Organize all of my scraps ala Bonnie Hunter.

Non quilty projects are finishing the inside painting in Tarpon, laying hard flooring in my sewing room there, the hallway and kitchen, then cleaning and painting the outside. Have six weeks to finish those.

Last edited by Krisb; 01-02-2016 at 09:13 AM.
Krisb is offline