The quilt I am working with has a large(size of a queen size bed top less pillow space) medallion in it . out side the medallion are 2 rows of wide sashing (the drop) I guess, I could set my machine on its longest stitch and 'baste' an x and a + to stabilize it , then go to the middle of the 9 patch medallion and begin. Does this seem reasonable?