View Single Post
Old 08-12-2020, 06:52 AM
  #842  
rryder
Super Member
 
Join Date: Oct 2015
Location: Va.
Posts: 5,753
Default

Hopscotching here too. Was trying to get a UFO finished, but needed to dye/paint some fabric for the backing and was out of the fabric medium I use. So I ordered some on Saturday and it was supposed to be here yesterday. Unfortunately, I received an email from Amazon saying it was delayed (which usually means lost in transit). If it’s not here by tomorrow I can have them send a replacement or issue a refund- aargh. The dye process takes at least four days. That means that UFO will be lounging around and being moved from one work surface To another for at least two more weeks assuming I get the replacement sometime early next week . So, I am working on another UFO, but it’s huge and heavy which means that Even though I have a suspension system on the Sweet Sixteen, I can only quilt for short bursts at a time before I need a break. Oh well, at least both of them used only stash, so that's a fair amount of yardage gone.

I also need to make hanging sleeves for 4 quilts and pool noodle storage bags for 6 that are currently folded and stacked in the studio. So that will use up a bunch of the muslin that I bought this past winter?spring?.

Rob



rryder is offline