View Single Post
Old 09-07-2020, 11:32 AM
  #933  
Irishrose2
Super Member
 
Join Date: Jan 2015
Posts: 2,867
Default

Grr. Hurrying doesn't work with quilting. My quilt has two very different colored blocks made of nine patches and HSTs so I felt comfortable working with one of each at a time so I could chain sew. Yup, sewed a red/black strip of three blocks to a strip of red/white blocks. Seam ripper time. Thank goodness it's only 18 1/2". I will finish these blocks today and start the sashing!!!!!

I need y'all to remind me why I'm here. There is a jelly roll calling my name. I don't need it, I wouldn't have time to use it, but I WANT it!
Irishrose2 is offline