View Single Post
Old 11-14-2021, 01:16 PM
  #66  
Irishrose2
Super Member
 
Join Date: Jan 2015
Posts: 2,867
Default

I'm very late to the party, but I'm working on the three quilts I need finished and mailed before Thanksgiving. The baby quilt is done. The first wedding quilt is sandwiched and under the needle on a machine. the other wedding quilt is on the design wall. It starts with a panel so that will help.
Irishrose2 is offline