Old 01-02-2023, 09:32 AM
  #49  
rryder
Super Member
 
Join Date: Oct 2015
Location: Va.
Posts: 5,752
Default

I got the quilting done on my Crosswinds quilt and have the binding stitched to the front. Just need to finish hand stitching it to the back. I also got all the paper pieced pieces for the Sunflower Illusions quilt put on the design wall and figured out which ones got with which, so now I just need to make 30 blocks out of the 60 curved pieces.

Rob
rryder is offline