Go Back  Quiltingboard Forums >
  • Main
  • What's Your Next Project >
  • What's Your Next Project

  • What's Your Next Project

    Thread Tools
     
    Old 11-04-2019, 08:59 PM
      #11  
    Super Member
     
    Join Date: Aug 2011
    Location: kansas
    Posts: 6,407
    Default

    I always have several things going at same time--tomorrow I need to finish cutting and kitting the last part for our guild president's blocks; I need to get a friend's table runner quilted, start on the designs for her TV lap quilt, quilt my sis's place mats for Christmas; and finish (blocks done,just have to put together then quilt) my DD's Christmas quilt. I know it sounds like a lot, but just found out today that I will be jobless this week while pool (I teach water wellness) repaired--so have lots of time.
    quiltingshorttimer is offline  
    Old 11-04-2019, 08:59 PM
      #12  
    Super Member
     
    Join Date: Jan 2011
    Posts: 2,050
    Default

    Start the BHMQ mystery starting November 29th, and continue to work on my 1.5” batik scrappy. I’m cheating on this, I’m using pellon quilter’s grid. I have 2 of them ironed, only 18 more to go. Plus finish 3-4 twin to lap size quilts to donate to charity or give away to family members.
    happylab is offline  
    Old 11-04-2019, 09:57 PM
      #13  
    Member
     
    Join Date: Jan 2018
    Location: Alberta, Canada
    Posts: 69
    Default

    Finishing up two Christmas table runners for gifts. The first one is ready for binding and the second is ready to go under the needle and be quilted. After they are done I have too many projects that have yet to be started! The hard part is choosing which to start first.
    MariaM is offline  
    Old 11-04-2019, 10:03 PM
      #14  
    Super Member
     
    Join Date: Mar 2011
    Location: in the sticks of PA
    Posts: 2,312
    Default

    I'm making myself a new purse and putting together 2 quilts, one is a gift for my god daughter and the other is for my step daughter. Both are in different stages of completion but neither should take that long. As for the purse I chose the fabric and hardware, I've changed the pattern several times now so I need to make a decision!
    Ariannaquilts is offline  
    Old 11-05-2019, 12:16 AM
      #15  
    Junior Member
     
    Bobbinalong's Avatar
     
    Join Date: Mar 2015
    Location: NE England
    Posts: 212
    Default

    Apart from all my UFOs? 8 Linus tops quilted and bound this week with a pile still to do. I want to pluck up courage to try a 'written' label on my Janome 8900 for the Linus quilt my 8yr old grandson has made. It;s a long time since I used the alphabet on my 4800 so I guess I need to open the 102 pages of instructions!
    Bobbinalong is offline  
    Old 11-05-2019, 01:26 AM
      #16  
    Super Member
     
    Join Date: Oct 2015
    Location: Va.
    Posts: 5,753
    Default

    I need to bind the UFO that I finished quilting last week. Then I’ve got to get moving on DGD’s 21st birthday quilt- want to get it done by 11/24. Meanwhile I’m slowly making progress on the collaged orbs and arcs for the quilt I started in the Danny Amazonas workshop back in August. Also need to work on gifts for barn friends!
    rryder is offline  
    Old 11-05-2019, 02:03 AM
      #17  
    Senior Member
     
    Join Date: Apr 2019
    Posts: 847
    Default

    I have 3 (!) Quilts in the "just need binding" binding pile so of course I'm going to start a charity project for Habitat for Humanity and my church. We don't have a quilting group yet so I'm hoping to start one.
    Rff1010 is offline  
    Old 11-05-2019, 03:57 AM
      #18  
    Super Member
     
    Join Date: Feb 2011
    Location: Yorkville, IL
    Posts: 7,639
    Default

    I plan to make “The Raven” and will start it in January. Until then I am making as many little quilts as I can. I have them all ready to cut and sew!
    luvstoquilt is offline  
    Old 11-05-2019, 03:59 AM
      #19  
    Senior Member
     
    Join Date: Aug 2016
    Location: Pennsylvania
    Posts: 365
    Default

    We all sound the same! I too have a lot of things going at one time. Just finished embroidery on a friend vintage stockings. (She wanted to put names on them.) This was on my small 4x4 Brother! Thank goodness another friend in our group is an embroidery whiz. That was a challenge. Also finished another vintage stocking for someone that needed hand sewing. (Yes I know I need to say no but these are friends I really care about.)
    Also finishing a table mat made with strips cut into 60° triangles.
    That was great fun.
    Quiltingshortimer enjoy your time off!
    Nesie is offline  
    Old 11-05-2019, 05:50 AM
      #20  
    Super Member
     
    sewingitalltogether's Avatar
     
    Join Date: Aug 2015
    Location: Michigan
    Posts: 1,297
    Default

    I'm having a mini quilt retreat for myself today. I am washing about 20 yards of red with 3 color catchers. Making a Christmas quilt using the Goose in the Pond block using reds and white. I bought the most gorgeous red Christmas fabric that will be perfect for this.
    sewingitalltogether is offline  
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    PrettyKitty
    Pictures
    24
    07-26-2012 08:34 AM
    ragqueen03
    General Chit-Chat (non-quilting talk)
    12
    09-21-2011 02:17 PM
    sarge1
    Main
    97
    09-03-2010 12:42 PM

    Posting Rules
    You may not post new threads
    You may not post replies
    You may not post attachments
    You may not edit your posts

    BB code is On
    Smilies are On
    [IMG] code is On
    HTML code is On
    Trackbacks are Off
    Pingbacks are Off
    Refbacks are Off



    FREE Quilting Newsletter