Go Back  Quiltingboard Forums >
  • Main
  • LA owners don't say much about loading a quilt on the frame. >
  • LA owners don't say much about loading a quilt on the frame.

  • LA owners don't say much about loading a quilt on the frame.

    Thread Tools
     
    Old 03-03-2011, 09:22 PM
      #61  
    Super Member
     
    Join Date: Jan 2008
    Location: currently central new jersey
    Posts: 8,623
    Default

    Originally Posted by MaryStoaks
    It takes me less, 20 to 30 minutes. I float the top and batting, just lay them on the backing after the backing is loaded and rolled on the frame poles/leaders. I use a few pins to keep the top and batting straight on the backing, then sew around the edges to attach it. I do have to take a minute to straighten the top and batting with each advance of the quilt. :thumbup: :thumbup:
    i also pin the backing to the leaders (20 minutes), lay down the batting and the top and machine baste straight across (5-10 minutes) and float the batting and top without rolling them.
    i don't even stitch the sides. i use a dowel and clamp technique that works for me and i advance that as i go along with the normal clamping. 2 hours to load the frame sounds excessive.
    butterflywing is offline  
    Old 03-03-2011, 09:51 PM
      #62  
    Super Member
     
    tjradj's Avatar
     
    Join Date: Sep 2010
    Location: London, Ontario, Canada
    Posts: 1,326
    Default

    My first quilt took me about an hour and a half to load. It's been getting faster with each quilt.
    Then I thought I'd try the zippered leaders, ordered them, they're sitting in the corner.
    So, I ordered the Red Snappers. LOVE, LOVE, LOVE THEM!!
    Now I just snap the quilt on and I'm ready to go in 10-15 minutes. Yeah!
    tjradj is offline  
    Old 03-04-2011, 03:37 PM
      #63  
    Junior Member
     
    Cathleen Colson's Avatar
     
    Join Date: Apr 2010
    Location: Monterey Bay, California
    Posts: 139
    Default

    I tried pinning, I tried sewing to the leaders with my domestic machine. Then I got the red snappers! I have a couple of sets of leaders, put rod pockets on them, now I can snap backing to leaders on or off machine. The leaders have velcro on one edge, rod pocket on the other. Makes it possible to switch out quilts (nice when I decide I need to put on a practice quilt to perfect a technique). Red snappers are great! I have adapted some for side tension, too. I float top and backing so it doesnt take more than a minute or 2 to swap out a quilt.
    Cathleen Colson is offline  
    Old 03-04-2011, 03:50 PM
      #64  
    Senior Member
     
    QuiltQtrs's Avatar
     
    Join Date: Mar 2010
    Location: NW Arkansas
    Posts: 984
    Default

    On my Singer Short(mid)Arm machine , I would say it takes between
    30-45 min. depending on size of project. (That doesn't include pressing
    the quilt top, often piecing customer's backing fabric, and cutting required
    length of batting) And, no, I don't have any of the gadgets
    to make things easier.
    I never "float" batting and backing, as I prefer things to be
    in absolute alignment and taut as I quilt.
    QuiltQtrs is offline  
    Old 03-04-2011, 09:43 PM
      #65  
    Power Poster
    Thread Starter
     
    BellaBoo's Avatar
     
    Join Date: Jan 2009
    Location: Front row
    Posts: 14,646
    Default

    I know if I had felt the thrill for it, the time wouldn't have mattered at all. My passion for wanting a LA machine has fizzled out a whole lot and I'm glad it wasn't after I bought one.
    BellaBoo is offline  
    Old 03-06-2011, 08:28 AM
      #66  
    Super Member
     
    Join Date: Dec 2008
    Location: La Quinta, CA
    Posts: 3,918
    Default

    Originally Posted by butterflywing
    Originally Posted by MaryStoaks
    It takes me less, 20 to 30 minutes. I float the top and batting, just lay them on the backing after the backing is loaded and rolled on the frame poles/leaders. I use a few pins to keep the top and batting straight on the backing, then sew around the edges to attach it. I do have to take a minute to straighten the top and batting with each advance of the quilt. :thumbup: :thumbup:
    i also pin the backing to the leaders (20 minutes), lay down the batting and the top and machine baste straight across (5-10 minutes) and float the batting and top without rolling them.
    i don't even stitch the sides. i use a dowel and clamp technique that works for me and i advance that as i go along with the normal clamping. 2 hours to load the frame sounds excessive.
    I just loaded one. Took me 17 minutes and I'm ready to quilt. I didn't hurry, just pinned the backing to the leaders, rolled the backing and arranged the batting and top.
    MaryStoaks is offline  
    Old 03-14-2011, 12:26 PM
      #67  
    Super Member
     
    Ripped on Scotch's Avatar
     
    Join Date: Apr 2010
    Location: Ontario Canada
    Posts: 1,328
    Default

    Ok those Red snappers look awesome! I may need to look at those.. I have the tendancy to get my shirts caught on the pins at the bottom of the quilts. I'm leaning over to check my stitches most of the time that I do that... but those look like they would really help.
    Ripped on Scotch is offline  
    Old 03-14-2011, 03:12 PM
      #68  
    Super Member
     
    Join Date: Jan 2008
    Location: currently central new jersey
    Posts: 8,623
    Default

    Originally Posted by MaryStoaks
    Originally Posted by butterflywing
    Originally Posted by MaryStoaks
    It takes me less, 20 to 30 minutes. I float the top and batting, just lay them on the backing after the backing is loaded and rolled on the frame poles/leaders. I use a few pins to keep the top and batting straight on the backing, then sew around the edges to attach it. I do have to take a minute to straighten the top and batting with each advance of the quilt. :thumbup: :thumbup:
    i also pin the backing to the leaders (20 minutes), lay down the batting and the top and machine baste straight across (5-10 minutes) and float the batting and top without rolling them.
    i don't even stitch the sides. i use a dowel and clamp technique that works for me and i advance that as i go along with the normal clamping. 2 hours to load the frame sounds excessive.
    I just loaded one. Took me 17 minutes and I'm ready to quilt. I didn't hurry, just pinned the backing to the leaders, rolled the backing and arranged the batting and top.
    mary, do you machine baste cross the top? ooops! i think you said yes.
    butterflywing is offline  
    Old 03-19-2011, 12:02 PM
      #69  
    Member
     
    Join Date: Feb 2011
    Posts: 7
    Default

    what are Pinmoors?
    Sew be it is offline  
    Old 03-19-2011, 12:04 PM
      #70  
    Member
     
    Join Date: Feb 2011
    Posts: 7
    Default

    What are Red Snappers and where do you get them?
    Sew be it is offline  
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    vicki s
    Main
    11
    08-27-2013 07:02 AM
    themeemama
    Main
    9
    10-24-2011 09:50 AM
    treynmama
    Main
    0
    11-27-2009 08:41 AM

    Posting Rules
    You may not post new threads
    You may not post replies
    You may not post attachments
    You may not edit your posts

    BB code is On
    Smilies are On
    [IMG] code is On
    HTML code is On
    Trackbacks are Off
    Pingbacks are Off
    Refbacks are Off



    FREE Quilting Newsletter