Go Back  Quiltingboard Forums > Main
Virtual Quilting Weekend -- November 10-12, 2017 >

Virtual Quilting Weekend -- November 10-12, 2017

Virtual Quilting Weekend -- November 10-12, 2017

Thread Tools
 
Old 11-09-2017, 06:44 PM
  #11  
Super Member
 
Join Date: Aug 2011
Location: kansas
Posts: 6,407
Default

I plan to be "in"--doing a friend a favor tomorrow morning and then working a shop hop in afternoon. But Sat. while I'm getting a new floor in my basement where LA is (yeah! finally!) I plan to bind a cancer quilt for friend, put binding on my nephew's t-shirt quilt, but I really need to be on the LA--two quilts of my sister's to do (both with lots of quilting), 3 tv snuggle fleece/panel little quilts for g-boys, and a quilted vest for DS--all before Christmas. oh, and 2 more placemats for sister's Christmas and ???
quiltingshorttimer is offline  
Old 11-09-2017, 06:45 PM
  #12  
Super Member
 
Join Date: Aug 2011
Location: kansas
Posts: 6,407
Default

Originally Posted by QuiltingVagabond View Post
This is the perfect incentive for me to get the quilting done on this project - back in September my local guild had a jelly roll challenge and I made this one. My daughter loves it because it is so neutral, definitely not my usual style!
[ATTACH=CONFIG]583606[/ATTACH]
that is a very cool quilt! Can't wait to see the finished quilt!
quiltingshorttimer is offline  
Old 11-09-2017, 07:04 PM
  #13  
Super Member
 
Join Date: Oct 2015
Location: Va.
Posts: 5,752
Default

I’m in. I need to get the October columns put on my temperature quilt, square up and bind a UFO, finish the painting on a whole cloth quilt top so I can reclaim my large work table, and make some Christmas presents.

Rob
rryder is offline  
Old 11-09-2017, 09:58 PM
  #14  
Super Member
 
Join Date: Jan 2011
Posts: 2,039
Default

I’m in. I plan to sew binding on 2 quilts I got back from long armer last week. Then finish 2 quillows, just need to quilt and put pouch on quilt. Next work on temp quilt, at least get 3-4 month’s sewn together. Followed by working on various blocks for other projects and lastly work on quilting bee swap blocks (cant’t post pic until after the swap). This should be enough to keep me entertained.
I will post pics as I finish projects. Happy sewing/quilting everyone. My sewing starts tomorrow early.
happylab is offline  
Old 11-09-2017, 10:22 PM
  #15  
Super Member
 
Join Date: Jan 2013
Location: Florida
Posts: 3,828
Default

Quilting Vagabond, lovely quilt.

I'm in. Since I have a meeting tomorrow morning, think I'll start tonight by finishing what I started last night.
petthefabric is offline  
Old 11-10-2017, 03:33 AM
  #16  
Super Member
 
tallchick's Avatar
 
Join Date: Sep 2011
Location: Ohio
Posts: 2,942
Default

I’m in, I want to get another quilt bound, and another one at least partially quilted, that would leave me with just 3 more tops to go. Thanks for hosting another weekend, I can’t wait to see what everyone is working on.
tallchick is offline  
Old 11-10-2017, 03:55 AM
  #17  
Power Poster
 
QuiltnNan's Avatar
 
Join Date: Mar 2011
Location: western NY formerly MN, FL, NC, SC
Posts: 51,432
Default

Originally Posted by QuiltingVagabond View Post
This is the perfect incentive for me to get the quilting done on this project - back in September my local guild had a jelly roll challenge and I made this one. My daughter loves it because it is so neutral, definitely not my usual style!
[ATTACH=CONFIG]583606[/ATTACH]
i love this jelly roll variation!
QuiltnNan is offline  
Old 11-10-2017, 03:56 AM
  #18  
Power Poster
 
QuiltnNan's Avatar
 
Join Date: Mar 2011
Location: western NY formerly MN, FL, NC, SC
Posts: 51,432
Default

i'll be working on assembling a charity quilt top and practice some FMQ
QuiltnNan is offline  
Old 11-10-2017, 04:02 AM
  #19  
Super Member
 
Belfrybat's Avatar
 
Join Date: Oct 2012
Location: West Central Texas
Posts: 2,586
Default

I'm in -- I missed the last two but remembered to put this one on my calendar. I started last night on a Triangle Frenzy table runner. Cut out two so will sew and layer them today. I also need to make a couple of throw quilts suitable for men. I have some 8" 4 patches left over from a project several years ago so think I'll snowball some neutral squares and alternate them. I might get enough for 2 quilts, but for sure one. Then there's the summer swap blocks from last year that I need to assemble and finish. Yikes! Lots of projects.
Belfrybat is offline  
Old 11-10-2017, 04:44 AM
  #20  
Member
 
Join Date: Oct 2017
Posts: 22
Default

I’m in! I have to finish up a quilt for my great nephew, some Christmas gifts, the list goes on and on.
Kp3690 is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Raggiemom
Main
155
06-09-2017 05:05 AM
Raggiemom
Main
92
04-17-2017 03:47 PM
Raggiemom
Main
72
03-13-2017 04:37 PM
Raggiemom
Main
68
02-15-2017 03:12 PM
Raggiemom
Main
109
01-28-2017 11:11 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



FREE Quilting Newsletter