Originally Posted by MTS
I can't begin to tell you the depth of my hots for Mike Holmes. ;-)


:lol: :lol: He is definitely my hero!
QuiltnNan is offline  
Old 05-10-2011, 02:21 PM
  #22  
Junior Member
 
Join Date: Apr 2011
Location: S IL
Posts: 171
Default

Pictures pictures pictures! Remember you only have so long to dispute your CC, call your CC company and talk to them to be sure of what you have to do. Just in case.
Good luck.
2000HD is offline  
Old 05-10-2011, 02:41 PM
  #23  
Senior Member
 
roda's Avatar
 
Join Date: Oct 2010
Location: Okla
Posts: 496
Default

We run an HVAC an Elec Co this deposit business is something that bugs me we have a guy here that requires one up front and then your stuck with him and his time table plus he doesn't have to please u because he's paid pretty much We have a contract signed before we work but no money is payed till the job is done or if we do have a draw Its one for the rough in and one for the finish out
roda is offline  
Old 05-10-2011, 03:15 PM
  #24  
Senior Member
 
Radiana's Avatar
 
Join Date: Jan 2011
Posts: 502
Default

Originally Posted by ssgramma
Originally Posted by roda
Maybe I'm not understanding Did you pay for the job before it was done
Absolutely NOT!

75% deposit was required - I still owe the balance.
I'm from California and I've never heard of a 75% deposit. I don't think contractors here are allowed to charge that much.
Radiana is offline  
Old 05-10-2011, 03:38 PM
  #25  
Super Member
Thread Starter
 
ssgramma's Avatar
 
Join Date: Mar 2010
Location: Bowling Green, KY
Posts: 2,024
Default

Originally Posted by Radiana
Originally Posted by ssgramma
Originally Posted by roda
Maybe I'm not understanding Did you pay for the job before it was done
Absolutely NOT!

75% deposit was required - I still owe the balance.
I'm from California and I've never heard of a 75% deposit. I don't think contractors here are allowed to charge that much.
Moved here from So Cal and you are right! I never dealt with such idiots there as here!!!
ssgramma is offline  
Old 05-10-2011, 03:51 PM
  #26  
Super Member
 
DogHouseMom's Avatar
 
Join Date: Jan 2011
Location: Knot Merrill, Southern Indiana
Posts: 5,781
Default

I feel for you!!!

We had a contractor do some work, lucky for us he lives across the street and is now a good friend. Shortly after he finished the big job he retired and his son took over. When it was time to do the deck his son was here, dug a hole for the deck footing and DRILLED right through our septic tank!! To make matters worse, he picked up his stuff and LEFT. Never said a word to my husband who was home at the time. Husband went looking for him, found the hole, saw the inside of the septic and damn near blew a gasket himself.

It was very difficult having "words" with Chris (the son) because we were such good friends with Ed (the dad). But Dad and son came over and husband gave son what for and dad backed up husband 100% and told son "if you expect to get more contract work in this town you better make him happy because I'll make sure that he tells everyone what you did".

I say by all means the contractor needs to know what is expected, and when you are not happy, and what he can do to make you happy. I can understand mistakes whether theirs or someone elses, mistakes happen, but regardless of the cause the contractor has to make sure that the mistakes are fixed.
DogHouseMom is offline  
Old 05-11-2011, 06:31 AM
  #27  
Super Member
 
mhansen6's Avatar
 
Join Date: Jun 2010
Location: Bend, Oregon
Posts: 1,853
Default

Sounds normal to me. Contractors always say that they will be there tomorrow and show up next Friday. When they give you a timeline for the job, double it at least.
mhansen6 is offline  
Old 05-11-2011, 06:51 AM
  #28  
Member
 
Join Date: Sep 2009
Location: Phoenix
Posts: 88
Default

sounds like a call to the board of contractors in your state is needed.
cmathena is offline  
Old 05-11-2011, 07:14 AM
  #29  
Super Member
 
QBeth's Avatar
 
Join Date: Jul 2009
Location: Nashua, NH
Posts: 1,463
Default

Originally Posted by ssgramma
I can't begin to tell you the depth of my hots for Mike Holmes. ;-)
LOL I hear ya!!!
Double "hear ya!!" I look at things so much differently since I started watching his shows. What is it with contractors??
QBeth is offline  
Old 05-11-2011, 07:43 AM
  #30  
Senior Member
 
Join Date: Sep 2009
Location: Dothan, Alabama
Posts: 914
Default

Originally Posted by ssgramma
Thanks guys - I'm starting to feel a little better (calmer?).

I have never had someone drop the ball THIS badly. And we took the highest bid as it was the most reputable company in town! I mean how dang hard can it be to lay 3 small areas of vinyl???

I seriously considered tiling them myself but didn't really know how to deal with hardwood transition strips or the pedestal sink in the powder room. I guess I should have figured it out!!!

The owner's better figure out that a pretty deep discount is in order or their good name will quickly turn to mud!
A reputable company is only as good as the contractors that they hire. I would expect someone high up in the company to come out and inspect the work and the flaws.
Zephyr is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Chasing Hawk
Pictures
12
10-14-2012 12:15 PM
Chasing Hawk
Pictures
122
04-06-2011 04:54 PM
wolph33
Pictures
80
03-14-2011 06:17 PM
wolph33
Pictures
13
10-04-2010 06:59 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



FREE Quilting Newsletter