Go Back  Quiltingboard Forums >
  • General Chit-Chat (non-quilting talk)
  • Dealing with remodel issues >
  • Dealing with remodel issues

  • Dealing with remodel issues

    Thread Tools
     
    Old 05-10-2011, 01:20 PM
      #21  
    Power Poster
     
    QuiltnNan's Avatar
     
    Join Date: Mar 2011
    Location: western NY formerly MN, FL, NC, SC
    Posts: 51,430
    Default

    Originally Posted by MTS
    I can't begin to tell you the depth of my hots for Mike Holmes. ;-)


    :lol: :lol: He is definitely my hero!
    QuiltnNan is offline  
    Old 05-10-2011, 02:21 PM
      #22  
    Junior Member
     
    Join Date: Apr 2011
    Location: S IL
    Posts: 171
    Default

    Pictures pictures pictures! Remember you only have so long to dispute your CC, call your CC company and talk to them to be sure of what you have to do. Just in case.
    Good luck.
    2000HD is offline  
    Old 05-10-2011, 02:41 PM
      #23  
    Senior Member
     
    roda's Avatar
     
    Join Date: Oct 2010
    Location: Okla
    Posts: 496
    Default

    We run an HVAC an Elec Co this deposit business is something that bugs me we have a guy here that requires one up front and then your stuck with him and his time table plus he doesn't have to please u because he's paid pretty much We have a contract signed before we work but no money is payed till the job is done or if we do have a draw Its one for the rough in and one for the finish out
    roda is offline  
    Old 05-10-2011, 03:15 PM
      #24  
    Senior Member
     
    Radiana's Avatar
     
    Join Date: Jan 2011
    Posts: 502
    Default

    Originally Posted by ssgramma
    Originally Posted by roda
    Maybe I'm not understanding Did you pay for the job before it was done
    Absolutely NOT!

    75% deposit was required - I still owe the balance.
    I'm from California and I've never heard of a 75% deposit. I don't think contractors here are allowed to charge that much.
    Radiana is offline  
    Old 05-10-2011, 03:38 PM
      #25  
    Super Member
    Thread Starter
     
    ssgramma's Avatar
     
    Join Date: Mar 2010
    Location: Bowling Green, KY
    Posts: 2,024
    Default

    Originally Posted by Radiana
    Originally Posted by ssgramma
    Originally Posted by roda
    Maybe I'm not understanding Did you pay for the job before it was done
    Absolutely NOT!

    75% deposit was required - I still owe the balance.
    I'm from California and I've never heard of a 75% deposit. I don't think contractors here are allowed to charge that much.
    Moved here from So Cal and you are right! I never dealt with such idiots there as here!!!
    ssgramma is offline  
    Old 05-10-2011, 03:51 PM
      #26  
    Super Member
     
    DogHouseMom's Avatar
     
    Join Date: Jan 2011
    Location: Knot Merrill, Southern Indiana
    Posts: 5,781
    Default

    I feel for you!!!

    We had a contractor do some work, lucky for us he lives across the street and is now a good friend. Shortly after he finished the big job he retired and his son took over. When it was time to do the deck his son was here, dug a hole for the deck footing and DRILLED right through our septic tank!! To make matters worse, he picked up his stuff and LEFT. Never said a word to my husband who was home at the time. Husband went looking for him, found the hole, saw the inside of the septic and damn near blew a gasket himself.

    It was very difficult having "words" with Chris (the son) because we were such good friends with Ed (the dad). But Dad and son came over and husband gave son what for and dad backed up husband 100% and told son "if you expect to get more contract work in this town you better make him happy because I'll make sure that he tells everyone what you did".

    I say by all means the contractor needs to know what is expected, and when you are not happy, and what he can do to make you happy. I can understand mistakes whether theirs or someone elses, mistakes happen, but regardless of the cause the contractor has to make sure that the mistakes are fixed.
    DogHouseMom is offline  
    Old 05-11-2011, 06:31 AM
      #27  
    Super Member
     
    mhansen6's Avatar
     
    Join Date: Jun 2010
    Location: Bend, Oregon
    Posts: 1,853
    Default

    Sounds normal to me. Contractors always say that they will be there tomorrow and show up next Friday. When they give you a timeline for the job, double it at least.
    mhansen6 is offline  
    Old 05-11-2011, 06:51 AM
      #28  
    Member
     
    Join Date: Sep 2009
    Location: Phoenix
    Posts: 88
    Default

    sounds like a call to the board of contractors in your state is needed.
    cmathena is offline  
    Old 05-11-2011, 07:14 AM
      #29  
    Super Member
     
    QBeth's Avatar
     
    Join Date: Jul 2009
    Location: Nashua, NH
    Posts: 1,463
    Default

    Originally Posted by ssgramma
    I can't begin to tell you the depth of my hots for Mike Holmes. ;-)
    LOL I hear ya!!!
    Double "hear ya!!" I look at things so much differently since I started watching his shows. What is it with contractors??
    QBeth is offline  
    Old 05-11-2011, 07:43 AM
      #30  
    Senior Member
     
    Join Date: Sep 2009
    Location: Dothan, Alabama
    Posts: 914
    Default

    Originally Posted by ssgramma
    Thanks guys - I'm starting to feel a little better (calmer?).

    I have never had someone drop the ball THIS badly. And we took the highest bid as it was the most reputable company in town! I mean how dang hard can it be to lay 3 small areas of vinyl???

    I seriously considered tiling them myself but didn't really know how to deal with hardwood transition strips or the pedestal sink in the powder room. I guess I should have figured it out!!!

    The owner's better figure out that a pretty deep discount is in order or their good name will quickly turn to mud!
    A reputable company is only as good as the contractors that they hire. I would expect someone high up in the company to come out and inspect the work and the flaws.
    Zephyr is offline  
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    Chasing Hawk
    Pictures
    12
    10-14-2012 12:15 PM
    Chasing Hawk
    Pictures
    122
    04-06-2011 04:54 PM
    wolph33
    Pictures
    80
    03-14-2011 06:17 PM
    wolph33
    Pictures
    13
    10-04-2010 06:59 PM

    Posting Rules
    You may not post new threads
    You may not post replies
    You may not post attachments
    You may not edit your posts

    BB code is On
    Smilies are On
    [IMG] code is On
    HTML code is On
    Trackbacks are Off
    Pingbacks are Off
    Refbacks are Off



    FREE Quilting Newsletter