Go Back  Quiltingboard Forums > Main
Virtual Quilting Weekend--Jan 17-20, 2020 >

Virtual Quilting Weekend--Jan 17-20, 2020

Virtual Quilting Weekend--Jan 17-20, 2020

Thread Tools
 
Old 01-17-2020, 08:09 PM
  #41  
Super Member
 
Join Date: Jan 2015
Posts: 2,867
Default

Originally Posted by Cheshirepat View Post
Is it weird that I envy everyone their cold and bad weather?! It's the best season here in the southwest -sunny and wonderful temperatures, but I really just long to be sewing one of my 13 UFO's! Plus, like Iceblossom said, sometimes have to make the hubby happy and do things outside my sewing room with him too! I'm definitely putting some more work into my log cabin UFO. She's up to the 2nd border -the piano key one- and I'm dying to finish it. Do I do another plain border afterwards? It's only about 48" right now.
If you want another border, I'd add it before the piano keys so they are the last border. How large will it be with the piano keys? Is that enough?
Irishrose2 is offline  
Old 01-17-2020, 08:52 PM
  #42  
Senior Member
 
Railroadersbrat's Avatar
 
Join Date: Jul 2019
Location: Gainesville, Missouri
Posts: 520
Default

Well, after a long sleep, a fresh pot of coffee, a John Wayne movie (The Cowboys) and getting a small load of laundry started, I'm in my quilting room waiting for my irons to heat up (I use a full size and a mini-iron).

I am really hoping I can resolve the issues I've got going, I absolutely love the hexagon quilts and I'm able to get the hexies into the flowers without so much as a glitch, but attaching the flowers to the black path, for whatever reason, is proving difficult. I'm changing up my way of putting them on, I'm doing the outer ring of color on the path first, then attaching the smaller flower from there, I'm hoping if I downscale a little, I can get the control I need.

Anybody has any ideas? I'm completely open to suggestions, lol.
Attached Thumbnails img_20200117_221504-640x480-.jpg  
Railroadersbrat is offline  
Old 01-17-2020, 10:25 PM
  #43  
Super Member
 
Join Date: Jul 2013
Location: Houston, TX
Posts: 9,518
Default

I took today off work and worked on my Only One quilt. I spent a good part of the afternoon rearranging blocks on the design wall. i"m hoping to come up with my final placement and get them sewn together this weekend.
cashs_mom is online now  
Old 01-18-2020, 02:45 AM
  #44  
Super Member
 
Join Date: Aug 2010
Location: N.E. England
Posts: 1,171
Default

I'm in, thanks for hosting Raggiemom. My small quilting group is making a scrappy quilt to donate to the children's corner in our local library. I've donated some of my scraps. There are four of us we've each made a 6x6 block with black sashing. I'm putting it together. I should have reminded everyone to check their seam allowance. Had to spend last evening adjusting most of the squares to fit. I'm picking up the last column at lunchtime just hoping I don't have any adjusting to do. Then a scrappy border and sandwich the quilt. My sewing room is beyond a mess and it's difficult to sew in there, so I'll have to spend some (a lot of) time tidying before I attempt to quilt.
cannyquilter is offline  
Old 01-18-2020, 03:26 AM
  #45  
Super Member
 
jmoore's Avatar
 
Join Date: Feb 2011
Location: Boothbay Maine
Posts: 9,518
Default

Rob, I hope you post a photo of your microquilting when you have it finished...I’m not sure I would have the patience but am always in awe of those who do...

Cheshirepat, your LC is looking great and I love the colors.

Quiltah mama, yes, it was quite chilly and windy yesterday. I wonder if we’ll get as much snow on this next storm. It sounds like you have plenty of bibs and burp cloths to keep you busy.
jmoore is offline  
Old 01-18-2020, 07:38 AM
  #46  
Super Member
 
Join Date: Dec 2009
Location: KANSAS
Posts: 1,059
Default

Dedemac, it's not easy, I am so glad that I'm retired so I don't have to go out in it. We had 16 slid in mishaps record for Friday in the metro. Now if it does rain and warm up some it could wash the ice away

Quiltingshorttimer, I live in the south part of Johnson County Kansas, between I-35 and US69. No ice or snow now just cold wind. So I really must sew

Happy sewing day everyone

cherry

Last edited by cherrybsixty; 01-18-2020 at 07:40 AM. Reason: delete some phrasing
cherrybsixty is offline  
Old 01-18-2020, 09:29 AM
  #47  
Super Member
 
Join Date: Jan 2013
Location: Florida
Posts: 3,827
Default

Checking in. Working on the back and got carried away. I think this may qualify as a second quilt.
petthefabric is offline  
Old 01-18-2020, 09:57 AM
  #48  
Super Member
 
Join Date: Jan 2015
Posts: 2,867
Default

I need to go out and clear the drive before I can quilt. The snow advisory is in effect until 7 pm tomorrow, but I'd rather clean the drive several times than just one deep mess. It's warming up and the warmer it gets, the heavier the snow so here I go into the falling snow. I got my border ripped and the new pieces pinned.
Irishrose2 is offline  
Old 01-18-2020, 10:03 AM
  #49  
Super Member
 
thimblebug6000's Avatar
 
Join Date: Jun 2007
Location: British Columbia
Posts: 8,056
Default

My happy project to get me through the snowy days!
Attached Thumbnails 2020-jan-18001_edited-small-.jpg  
thimblebug6000 is offline  
Old 01-18-2020, 10:04 AM
  #50  
Senior Member
 
cat2quilt's Avatar
 
Join Date: Oct 2011
Location: Edison, NJ
Posts: 772
Default Virtual Quilting weekend

I am working on small hand appliqués wool felt gifts card holders with a Christmas theme. I have 4 that are 90% finished and 2 that have the shapes cut but need sewing.
cat2quilt is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



FREE Quilting Newsletter