Begonias – 3 month Boom Group Thread
#581
SBG, you know I’ll squeeze as much as I can to try to get it all into the one package!
DH is installing a new kitchen light fixture. I hear a lot of grumbling (unusual for him) so I take it it’s not going as well as anticipated. I think I’ll hide out until he’s done. Lol.
Have a good day everyone.
DH is installing a new kitchen light fixture. I hear a lot of grumbling (unusual for him) so I take it it’s not going as well as anticipated. I think I’ll hide out until he’s done. Lol.
Have a good day everyone.
#582
Super Member
Join Date: Feb 2011
Location: Mn
Posts: 6,690
Boy does that sound familiar Janice. I pretty much know what to expect when Dh starts a project. At first he is all excited even joking about what could go wrong, then I start to hear mumbling and if it’s something that goes wrong but he understands the problem all is still ok. But when he can’t fix the problem or doesn’t understand why it’s not working I know it’s time to head to my sewing room and turn on the music. 😁
#583
Terriamn, lol! Yep, much the same here. But he solved the light problem fast this time. One time it was a dishwasher replacement. Omgosh, the language!!! But he managed it despite the problems. He always does but I just wait it out and offer no suggestions. Roflol
#590
LStew, thank you for my 2 blocks. They will be perfect in my quilt.
I have 3 more blocks to show. The first one is for Libster (a star in a star), one for Marcialee and the last is for NZQuilter. I hope these are okay for you ladies.
I have 3 more blocks to show. The first one is for Libster (a star in a star), one for Marcialee and the last is for NZQuilter. I hope these are okay for you ladies.