Boom 21 - Sign-ups now open thru 5/31***
#52
Janice, I got an email from you, so believe we are good now. We are confirmed. That limbo place is very interesting. LOL
I am working on deciding my fabrics this time. I have some purple shaded polka dot sitting on a shelf that could be used, or do I want to dip into some floral fabric I have? Pondering here.
I am ok if the two month goes to a three month, either way have blocks to be made. Just gives us more time to do them in.
I am working on deciding my fabrics this time. I have some purple shaded polka dot sitting on a shelf that could be used, or do I want to dip into some floral fabric I have? Pondering here.
I am ok if the two month goes to a three month, either way have blocks to be made. Just gives us more time to do them in.
#55
Made it to the quilt store today,so I have pics. All finished except the binding. I will bind it in white. I am very pleased w/ it front and back. Here are some pics. (the fuzzy on the black is just from the batting. Most of the front is hexified, it is all assembled qayg. It has finsihed 83 x 93
[ATTACH=CONFIG]594506[/ATTACH]
[ATTACH=CONFIG]594507[/ATTACH]
[ATTACH=CONFIG]594506[/ATTACH]
[ATTACH=CONFIG]594507[/ATTACH]
#57
LOL, you all are funny! Here's a spin, we're down to 18 in the 3 month group so there's still room there. There's always a bit of juggling and we're only a day in. Spread the word that we've got plenty of room for anyone who wants to have a little quilty fun!
#58
Kass that is fantabulous! and fast too
Made it to the quilt store today, so I have pics. All finished except the binding. I will bind it in white. I am very pleased w/ it front and back. Here are some pics. (the fuzzy on the black is just from the batting. Most of the front is hexified, it is all assembled qayg. It has finished 83 x 93
[ATTACH=CONFIG]594506[/ATTACH]
[ATTACH=CONFIG]594507[/ATTACH]
[ATTACH=CONFIG]594506[/ATTACH]
[ATTACH=CONFIG]594507[/ATTACH]
#60
I love it Kass... very beautiful, front and back!
I like having a 2 month group so I can finish one quilt at a time. I never quite understood why anyone would need three whole months to make these blocks, but if the group consensus is to do two 3-month groups, I won't object.
I like having a 2 month group so I can finish one quilt at a time. I never quite understood why anyone would need three whole months to make these blocks, but if the group consensus is to do two 3-month groups, I won't object.
Thread
Thread Starter
Forum
Replies
Last Post
Janice McC
Member Swaps and Round/Row Robins
292
07-21-2019 05:59 AM
Janice McC
Member Swaps and Round/Row Robins
372
07-01-2017 09:47 AM
Janice McC
Member Swaps and Round/Row Robins
628
01-07-2017 06:08 PM
Janice McC
Member Swaps and Round/Row Robins
361
12-07-2014 06:35 PM