2018 UFO Challenge of the Month
#881
Super Member
Join Date: Aug 2011
Location: Asheville, previously Lake Vermilion, Tarpon Springs, Duluth, St Paul, Soudan
Posts: 1,651
Dance of the Dragonflies is finally done. It is a beautiful pattern. If I did it again, the black of the wings would be cut as a single grid. And each wing and body would be preappliqued before being attached to the background. Maybe it was the humidity, but those little fusible pieces were ironed down about 4 times, it was machine basted after that, and they still kept falling off. Glad it is finally done. Back to poor neglected En Provence. The lighting isn’t great; sun hasn’t gotten to the back porch yet.
[ATTACH=CONFIG]595446[/ATTACH]
[ATTACH=CONFIG]595446[/ATTACH]
#883
Power Poster
Join Date: Jul 2009
Location: Between the dashes of a tombstone
Posts: 12,716
Oh yes...lovely butterflies indeed!
#886
Power Poster
Join Date: Mar 2009
Posts: 15,639
Oh wow, those latest finishes are real beauties.
#887
Great Dragonflies and Great job.. I have the pattern and fabric but no time to make it know, so it is on the bucket list for next year. Two wedding in one year takes a lot of time and doing my long arming too.
#888
Super Member
Thread Starter
Join Date: Jan 2011
Posts: 2,050
I wondered back with list of May’s finished UFO’s and grand total. Continuing from where I left off. Let the drums roll and confetti fly and we all scream and yell.
‘Quiltermomma = 847, baby quilt, very pretty.
Rryder = 12 more placemats #852
rryder = 3 ufo’s trivets #852
Kristakz = Jaffa Sasser quilt multicolored, #854
Dedemac = train ride quilt = 867
D.Henson = lap quilt #869/870
Krisb = dance of the Dragonflies, #881
this completes our May completed UFO’s, for a grand total of 43, 3 more than our goal this month. Contractions everyone for a great job.
‘Quiltermomma = 847, baby quilt, very pretty.
Rryder = 12 more placemats #852
rryder = 3 ufo’s trivets #852
Kristakz = Jaffa Sasser quilt multicolored, #854
Dedemac = train ride quilt = 867
D.Henson = lap quilt #869/870
Krisb = dance of the Dragonflies, #881
this completes our May completed UFO’s, for a grand total of 43, 3 more than our goal this month. Contractions everyone for a great job.
#889
Super Member
Thread Starter
Join Date: Jan 2011
Posts: 2,050
So far our June list is 0., ah, sad face. I know I need to start working on my UFO’s. I just need to finish with 2 swap projects 1st. Then ufo’s here I come. I’ve set up several to finish this month. Then I will have 3 more WIP’s to complete.
Our goal this month is 30. Have fun working on all of your projects, UFO’s or WIP’s.
Our goal this month is 30. Have fun working on all of your projects, UFO’s or WIP’s.
#890
Power Poster
Join Date: Mar 2009
Posts: 15,639
I got "voluntold" to FMQ a queen-sized quilt for a friend and that takes a long time for me (after work and weekends). So there is no time to work on UFOs right now.
Thread
Thread Starter
Forum
Replies
Last Post
CarolinePaj
Member Swaps and Round/Row Robins
273
01-26-2019 08:53 AM
CarolinePaj
Member Swaps and Round/Row Robins
166
04-30-2018 05:37 AM
asimplelife
QuiltingBoard Challenges & Contests
491
12-06-2014 06:06 AM
Fraew
Main
559
12-20-2013 10:07 AM