Go Back  Quiltingboard Forums > Main
How many "Works-in-Progress" do you normally work on at a time? >

How many "Works-in-Progress" do you normally work on at a time?

How many "Works-in-Progress" do you normally work on at a time?

Thread Tools
 
Old 08-01-2009, 03:36 AM
  #21  
Super Member
 
NorBanaquilts's Avatar
 
Join Date: Jun 2009
Location: Eastern PA
Posts: 2,835
Default

I have more projects started than I would like to admit. Like others there are times I tell myself I have to finish X number of projects before I can start a new one, that a great motivation for me.
NorBanaquilts is offline  
Old 08-01-2009, 04:40 AM
  #22  
Banned
 
Join Date: May 2008
Location: Port Angeles, WA
Posts: 12,675
Default

quilts 1. too confusing lol, but i do have embroidery and cross stitch going to. then i work on whatever my mood tells me
Bevanger is offline  
Old 08-01-2009, 04:57 AM
  #23  
Banned
 
Join Date: May 2008
Location: Port Angeles, WA
Posts: 12,675
Default

I never thought of pizza boxes. GREAT IDEA. That way they don't get all mixed up. Thanks for the idea :D
Bevanger is offline  
Old 08-01-2009, 05:34 AM
  #24  
Super Member
 
bearpaw's Avatar
 
Join Date: Jul 2008
Location: Pennsylvania
Posts: 1,635
Default

I don't really have a usuall number in the works. When I started I finished one, then moved on. Right now I have 2 UFO's, 3 WIP's, and two that need the binding finished. I have to have one done by the 15th of August - binding is halfway done. :D
bearpaw is offline  
Old 08-01-2009, 05:43 AM
  #25  
Super Member
 
Esqmommy's Avatar
 
Join Date: May 2009
Location: Tied up in Thread
Posts: 5,109
Default

I have two that need to be quilted, two that are still being pieced, the start of my chicken blocks and the doll quilt which is being quilted also. I guess that makes 3 quilts and a number of blocks.
Esqmommy is offline  
Old 08-01-2009, 06:06 AM
  #26  
Super Member
 
Join Date: Nov 2008
Location: Central PA
Posts: 3,736
Default

I'm like most everyone else. Too many to count. Active WIP, those that are out in view, probably 3 or 4. Those WIP that are tucked away in various stages of completion, goodness, lots and lots.
mimee4 is offline  
Old 08-01-2009, 09:31 AM
  #27  
Senior Member
 
quiltswithdogs's Avatar
 
Join Date: Apr 2009
Location: San Francisco Bay-Area...Union City
Posts: 443
Default

I think I generally have 3-4 at a time which includes my BOM.
I always have 2, for variety or maybe assembly-line fashion like Klue, but what happens is that I decide to make a new special-occasion gift so I add that. I can only start projects with deadlines way in advance so that means I have that one added on for awhile. I try to wait on the next desired project until the deadline one is done. So, I still can't take the time to learn kaleidoscoping until this baby quilt is done (getting close) and then my daughter's 30thBD wallhanging (haven't even planned yet). Then I'll go back to my BOM, my lapquilt for ME and learn kaleidoscope. I'd like to try tote bags for Christmas gifts but I'll have to see if that's when I'll be packing to move. I only have a small window of energy each day.
quiltswithdogs is offline  
Old 08-01-2009, 09:37 AM
  #28  
Moderator
 
Join Date: Jun 2008
Location: Camarillo, California
Posts: 35,242
Default

Well Eddie you said "works in progress" not UFO's so I usually have about 3-5 WIP's Going but I have a dozen or two UFO's. This weekent I plan on finishing 3 WIPS, 2 are done now, just have to finish the hand sewing of the binding one one more.
I usually have several waiting to be quilted, and I usually "sandwich" 3 or 4 at a time so I often have a couple tops waiting to be sandwiched. I have a bunch of block of the month's and quite a few block exchanges that need to be put together. I am not at home so I am not going to count.
Jim's Gem is offline  
Old 08-01-2009, 11:27 AM
  #29  
Super Member
 
katier825's Avatar
 
Join Date: Mar 2009
Location: FL
Posts: 7,084
Default

I'm glad you posted this topic...it will give me a chance to list and mentally prioritize my projects. :) Several are for Christmas, but I probably would normally have 2-4 going. I like to cut/prep them and put them in large ziploc bags so I can grab something quickly to work on it.

Active projects:
* 1 quilt that I just finished quilting and need to bind
* 1 quilt that is sandwiched and ready to quilt (hopefully tonight)
* 1 quilt that I started piecing (for me!)

Patiently waiting their turn:
* 2 tops that are done, I need to assemble the back, sandwich, quilt and bind.
* 1 quilt that is cut and ready to sew
* 1 quilt that is not cut yet
* 2 Christmas wallhangings for the kids
* 1 quilt that is partially assembled

Still in the dreaming/planning stage:
* Pink/peachy/yellow either log cabin or french braid quilt
* Mariner's Compass - just got the pattern after trying paper piecing!
* I need to make myself some placemats/table runners - someday!

The reason I jump around is due mostly to my setup. I finally squeezed a few sq. ft. into my bedroom for my machine. It's really cramped and I'm wedged between the bed and closet, so there's no room to quilt, but I can piece blocks there without much aggravation. When I get to the point of needing more space, I need to move out to the dining room. It's my only dining spot, so I have to disassemble for meals. I really can only work on the big stuff on the weekends. So, in order to get my "fix", I work on piecing during the week and quilting when I can on the weekends.
katier825 is offline  
Old 08-01-2009, 05:03 PM
  #30  
Power Poster
 
Join Date: Mar 2009
Posts: 15,639
Default

Originally Posted by Eddie
I've been just working on one thing at a time until completion, maybe I'm just single minded and can't do more than one thing at once. :)
It sounds like you are a "product person" and you are more interested in getting your project finished.

I, in comparison, am a "process person" and I am more interested in each step of the process. Sometimes I get bored with the process and the project goes night-night for a day or (week or forever).

There are days I wish I were more single minded and I would get stuff DONE. I stopped count at 15 UFOs - and about 4 of them are out on deck.
MadQuilter is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Shadow Dancer
Pictures
12
09-27-2012 03:52 PM
SandyinZ4
Pictures
19
02-28-2011 07:16 AM
DeneK
Pictures
18
01-09-2011 04:17 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



FREE Quilting Newsletter