Next Project
#1
I usually spend all my quilting time on one project, not working on more than 1 at a time. I spent 3 days making easy tote bags. Then I spent 2 days practicing my stitching on a line with a plain baby panel. I tell ya, I didn't get much better with practice. lol
Now I'm stuck on what to do next. I know what I want to do, but I don't have the fabric yet. I could make more tote bags, but I'd like to try something different.
If you're like me and only work on one project at time, do you have another waiting in the wings, all ready to start?
Now I'm stuck on what to do next. I know what I want to do, but I don't have the fabric yet. I could make more tote bags, but I'd like to try something different.
If you're like me and only work on one project at time, do you have another waiting in the wings, all ready to start?
#2
I usually only work on one thing at a time so I know I'll get them done! I finished a purse today and a tote yesterday..I have some baby quilts I want to get to but I need some backing fabric...since I was so busy sewing today I forgot to go to the store and get the material..first thing Monday I'll be there though..I have to work this weekend (yuck!)
#4
Super Member
Join Date: Mar 2009
Location: western Pa
Posts: 4,569
I usually have a couple of projects going: small like a laptop bag, a wall hanging, and a large handquilting project (haven't worked on it all summer, waiting for cooler weather) oh and a couple of table runners. Hmmm--I'm busier than I thought LOL.
#7
Super Member
Join Date: May 2010
Location: Ontario, Canada
Posts: 1,779
I always have projects in my head that I want to do but unfortunately due to time constraints they stay as ideas for a long time. I usually have more than one project on the go but I also try to complete them within a reasonable time so that the next one can begin :) Often my ideas are more than my sewing time allows. :)
#9
I am just itching to do another OBW, I have the fabric sitting there waiting but I am making myself finish a tablerunner for my mother before I start.
I am sewing the binding on right now so hopefully tomorrow I can start. Yipeeeeeee!!!!!!!!
I am sewing the binding on right now so hopefully tomorrow I can start. Yipeeeeeee!!!!!!!!
#10
Super Member
Join Date: Jul 2010
Location: Glenmoore, PA
Posts: 7,941
Originally Posted by MommaDorian
I usually spend all my quilting time on one project, not working on more than 1 at a time. I spent 3 days making easy tote bags. Then I spent 2 days practicing my stitching on a line with a plain baby panel. I tell ya, I didn't get much better with practice. lol
Now I'm stuck on what to do next. I know what I want to do, but I don't have the fabric yet. I could make more tote bags, but I'd like to try something different.
If you're like me and only work on one project at time, do you have another waiting in the wings, all ready to start?
Now I'm stuck on what to do next. I know what I want to do, but I don't have the fabric yet. I could make more tote bags, but I'd like to try something different.
If you're like me and only work on one project at time, do you have another waiting in the wings, all ready to start?
Thread
Thread Starter
Forum
Replies
Last Post
PrettyKitty
Pictures
24
07-26-2012 08:34 AM
ragqueen03
General Chit-Chat (non-quilting talk)
12
09-21-2011 02:17 PM
craftybear
Links and Resources
3
07-21-2011 08:49 AM