Go Back  Quiltingboard Forums >
  • Main
  • How many "Works-in-Progress" do you normally work on at a time? >
  • How many "Works-in-Progress" do you normally work on at a time?

  • How many "Works-in-Progress" do you normally work on at a time?

    Thread Tools
     
    Old 08-01-2009, 03:36 AM
      #21  
    Super Member
     
    NorBanaquilts's Avatar
     
    Join Date: Jun 2009
    Location: Eastern PA
    Posts: 2,835
    Default

    I have more projects started than I would like to admit. Like others there are times I tell myself I have to finish X number of projects before I can start a new one, that a great motivation for me.
    NorBanaquilts is offline  
    Old 08-01-2009, 04:40 AM
      #22  
    Banned
     
    Join Date: May 2008
    Location: Port Angeles, WA
    Posts: 12,675
    Default

    quilts 1. too confusing lol, but i do have embroidery and cross stitch going to. then i work on whatever my mood tells me
    Bevanger is offline  
    Old 08-01-2009, 04:57 AM
      #23  
    Banned
     
    Join Date: May 2008
    Location: Port Angeles, WA
    Posts: 12,675
    Default

    I never thought of pizza boxes. GREAT IDEA. That way they don't get all mixed up. Thanks for the idea :D
    Bevanger is offline  
    Old 08-01-2009, 05:34 AM
      #24  
    Super Member
     
    bearpaw's Avatar
     
    Join Date: Jul 2008
    Location: Pennsylvania
    Posts: 1,635
    Default

    I don't really have a usuall number in the works. When I started I finished one, then moved on. Right now I have 2 UFO's, 3 WIP's, and two that need the binding finished. I have to have one done by the 15th of August - binding is halfway done. :D
    bearpaw is offline  
    Old 08-01-2009, 05:43 AM
      #25  
    Super Member
     
    Esqmommy's Avatar
     
    Join Date: May 2009
    Location: Tied up in Thread
    Posts: 5,109
    Default

    I have two that need to be quilted, two that are still being pieced, the start of my chicken blocks and the doll quilt which is being quilted also. I guess that makes 3 quilts and a number of blocks.
    Esqmommy is offline  
    Old 08-01-2009, 06:06 AM
      #26  
    Super Member
     
    Join Date: Nov 2008
    Location: Central PA
    Posts: 3,736
    Default

    I'm like most everyone else. Too many to count. Active WIP, those that are out in view, probably 3 or 4. Those WIP that are tucked away in various stages of completion, goodness, lots and lots.
    mimee4 is offline  
    Old 08-01-2009, 09:31 AM
      #27  
    Senior Member
     
    quiltswithdogs's Avatar
     
    Join Date: Apr 2009
    Location: San Francisco Bay-Area...Union City
    Posts: 443
    Default

    I think I generally have 3-4 at a time which includes my BOM.
    I always have 2, for variety or maybe assembly-line fashion like Klue, but what happens is that I decide to make a new special-occasion gift so I add that. I can only start projects with deadlines way in advance so that means I have that one added on for awhile. I try to wait on the next desired project until the deadline one is done. So, I still can't take the time to learn kaleidoscoping until this baby quilt is done (getting close) and then my daughter's 30thBD wallhanging (haven't even planned yet). Then I'll go back to my BOM, my lapquilt for ME and learn kaleidoscope. I'd like to try tote bags for Christmas gifts but I'll have to see if that's when I'll be packing to move. I only have a small window of energy each day.
    quiltswithdogs is offline  
    Old 08-01-2009, 09:37 AM
      #28  
    Moderator
     
    Join Date: Jun 2008
    Location: Camarillo, California
    Posts: 35,242
    Default

    Well Eddie you said "works in progress" not UFO's so I usually have about 3-5 WIP's Going but I have a dozen or two UFO's. This weekent I plan on finishing 3 WIPS, 2 are done now, just have to finish the hand sewing of the binding one one more.
    I usually have several waiting to be quilted, and I usually "sandwich" 3 or 4 at a time so I often have a couple tops waiting to be sandwiched. I have a bunch of block of the month's and quite a few block exchanges that need to be put together. I am not at home so I am not going to count.
    Jim's Gem is offline  
    Old 08-01-2009, 11:27 AM
      #29  
    Super Member
     
    katier825's Avatar
     
    Join Date: Mar 2009
    Location: FL
    Posts: 7,084
    Default

    I'm glad you posted this topic...it will give me a chance to list and mentally prioritize my projects. :) Several are for Christmas, but I probably would normally have 2-4 going. I like to cut/prep them and put them in large ziploc bags so I can grab something quickly to work on it.

    Active projects:
    * 1 quilt that I just finished quilting and need to bind
    * 1 quilt that is sandwiched and ready to quilt (hopefully tonight)
    * 1 quilt that I started piecing (for me!)

    Patiently waiting their turn:
    * 2 tops that are done, I need to assemble the back, sandwich, quilt and bind.
    * 1 quilt that is cut and ready to sew
    * 1 quilt that is not cut yet
    * 2 Christmas wallhangings for the kids
    * 1 quilt that is partially assembled

    Still in the dreaming/planning stage:
    * Pink/peachy/yellow either log cabin or french braid quilt
    * Mariner's Compass - just got the pattern after trying paper piecing!
    * I need to make myself some placemats/table runners - someday!

    The reason I jump around is due mostly to my setup. I finally squeezed a few sq. ft. into my bedroom for my machine. It's really cramped and I'm wedged between the bed and closet, so there's no room to quilt, but I can piece blocks there without much aggravation. When I get to the point of needing more space, I need to move out to the dining room. It's my only dining spot, so I have to disassemble for meals. I really can only work on the big stuff on the weekends. So, in order to get my "fix", I work on piecing during the week and quilting when I can on the weekends.
    katier825 is offline  
    Old 08-01-2009, 05:03 PM
      #30  
    Power Poster
     
    Join Date: Mar 2009
    Posts: 15,639
    Default

    Originally Posted by Eddie
    I've been just working on one thing at a time until completion, maybe I'm just single minded and can't do more than one thing at once. :)
    It sounds like you are a "product person" and you are more interested in getting your project finished.

    I, in comparison, am a "process person" and I am more interested in each step of the process. Sometimes I get bored with the process and the project goes night-night for a day or (week or forever).

    There are days I wish I were more single minded and I would get stuff DONE. I stopped count at 15 UFOs - and about 4 of them are out on deck.
    MadQuilter is offline  
    Related Topics
    Thread
    Thread Starter
    Forum
    Replies
    Last Post
    Shadow Dancer
    Pictures
    12
    09-27-2012 03:52 PM
    SandyinZ4
    Pictures
    19
    02-28-2011 07:16 AM
    DeneK
    Pictures
    18
    01-09-2011 04:17 PM

    Posting Rules
    You may not post new threads
    You may not post replies
    You may not post attachments
    You may not edit your posts

    BB code is On
    Smilies are On
    [IMG] code is On
    HTML code is On
    Trackbacks are Off
    Pingbacks are Off
    Refbacks are Off



    FREE Quilting Newsletter